On-site Hardware

Built for the environment it measures

SriWatt devices record real sunlight, surface heat and shading at your actual site — second by second, not from a 4 km satellite cell.

Stage 5 of 6 in the life of a solar asset

  1. Site
  2. Design
  3. Quote
  4. Build
  5. Operate
  6. Finance
The problem

The four types of data inaccuracy

Bad input data quietly wrecks solar forecasts — and the finance that depends on them. These are the four most common culprits, and each is something a device on the site measures instead of guessing.

01

Bad metadata

30% of projects have missing or wrong tilt/azimuth data — enough to throw the forecast off by more than 15% (NREL).

02

Micro-shading

A vent, pole or single wire shading just 1–2% of a system can cut its output by 30–50%.

03

Albedo guesswork

The default “0.2” ground-reflectivity assumption misses up to 12.4% of the gain bifacial panels actually capture.

04

Soiling losses

A flat 2% dust assumption is fiction. In dry climates losses reach 35%, building ~0.5% a day.

$5B wasted every year

Roughly 94% of solar pre-sales spend is lost, and lenders add 10–35% to finance costs — almost all of it for want of real, on-site data.

How it works

One small device. Three steps.

Step 1 — Measure

Records real sunlight, surface heat and shading at the actual site — second by second.

Step 2 — Calibrate

Our algorithm learns the gap between simulation and site reality, then corrects the data.

Step 3 — Report

You get a clear, bank-ready P50/P90 yield report. Faster approvals, fewer arguments.

SriWatt device close-up
.sri vs. .pan

Retire the industry's "golden module" guesswork

Simulation software like PVsyst runs on .pan files — a module's idealised performance curve, built from manufacturer or lab-bench testing. It's the same static file used on every site, and it typically overstates real-world yield by 1–3%. A deployed SriWatt device replaces it with a .sri file: the module's actual, measured performance at that exact site.

.pan files

The industry-standard format for PVsyst and similar simulation tools.

  • Idealised curve from manufacturer or lab-bench testing
  • One static file, reused on every site regardless of local climate
  • A documented 1–3% optimism gap against real-world yield
  • Never updates once it's issued

.sri files

Generated on site by a deployed SriWatt device.

  • Built from I-V sweeps captured on the installed module, on site
  • Measured performance ratio, specific yield and degradation, with a confidence interval
  • Tamper-evident — every file carries an integrity hash and its full provenance
  • Updates over time into a location-specific digital twin
How many devices

Size your allotment

Move the sliders and we'll tell you how many units to reserve from the first batch of 5,000 — and where to go if the answer is fewer than we book online.

250 kWdc
1 kWdc1,000 kWdc
40
1250+
Estimated annual portfolio: 10 MWdc
50
devices to reserve

50% advance: $24,975 — balance on the contract invoice.

Hardware Architecture

Sealed, powered and mounted for the site

Two distinct deployment tiers, engineered for the conditions they operate in.

Tier 01

Standard Deployment

Engineered for commercial rooftops, urban installations, and standard utility-scale sites with cellular coverage.

  • ✓Cellular LTE transmission
  • ✓Single HDR optical sensor
  • ✓Standard IP67 weather sealing
  • ✓Real-time edge processing
  • ✓P50/P90 bankable yield evidence
  • ✓Unit replacement guarantee
$99.9/ month per device

(Billed annually (2 months free))

50% advance: $9,990 (for 20 devices)

Not sure how many? Use the calculator →

Minimum 20 devices. Balance due on contract invoice.

Tier 02

Absolute No Man’s Land

Built for the edge of the world. Total autonomy for remote deserts, offshore sites, and deep-grid areas with zero infrastructure.

  • ✓Satellite (NTN) & Cellular connectivity
  • ✓Dual-lens environmental scanning
  • ✓Submersion-proof sealing
  • ✓Infinite-endurance memory vault
  • ✓Autonomous operation — zero infrastructure required
Confidential Pricing — Available by pre-approval only for extreme remote sites.
Where it’s used

Built for real sites

Industrial rooftops

Factories and sheds where heat, dust and vents hit output hardest.

Farms & estates

Rural and agri sites where local weather changes field to field.

Developers & IPPs

Portfolio owners who need bankable numbers, fast, across many sites.

Results & insights

Numbers from the field, not from a deck

Field-tested on 1,200 commercial and industrial solar sites.

+532%
Lead conversion for EPCs
93%
Won't go back to simulations only
4.4/5
Client satisfaction
50%
O&M cost savings

“The trust it builds with the customer is priceless. Showing them real data from their own roof removes almost all performance objections.”

— Pilot participant

“The SriWatt report isn’t just a sales tool — it’s a financing tool. It dramatically sped up our talks with the banks.”

— Pilot participant

“A near-40% conversion rate is unheard of in this industry. The tool pays for itself many times over.”

— Pilot participant

The data behind the device

Independent, data-driven analyses of how on-site ground truth de-risks solar — from pre-sales costs to the cost of capital.

Secure your priority allotment

First 5,000 units available for priority booking. 50% advance, balance on contract invoice.